






My second Apprenticeship opportunity with Hunter Leggitt Studio was working on a gallery build out and install for a Los Angeles based artist group, CYRCLE. The exhibition, entitled "Organized Chaos", was located in Hollywood, CA and featured a hexagon tunnel entry, a large scale interactive wall piece with 250 interchangeable cubes, and various cubic floor and wall pieces. This architectural apprenticeship involved project-based assignments including making design decisions on interior detailing and personally constructing them. All projects solicited team-oriented execution in the design/build process. Operations encompassed a wide range of construction demands, ranging from artwork install and presentation, lighting, and entranceway instillation construction and finishing.